{"id":33069,"date":"2025-09-05T13:43:37","date_gmt":"2025-09-05T06:43:37","guid":{"rendered":"https:\/\/gtjai.com.vn\/?post_type=research&#038;p=33069"},"modified":"2025-09-15T13:47:14","modified_gmt":"2025-09-15T06:47:14","slug":"gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025","status":"publish","type":"research","link":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/","title":{"rendered":"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025"},"content":{"rendered":"<p><a href=\"https:\/\/gtjai.com.vn\/wp-content\/uploads\/2025\/09\/GTJASVN_HPG-Equity-Repor_2ND-PHASE-OF-DUNG-QUAT-2-READY-FOR-OPERATION_Sep-04-2025-en.pdf\">GTJASVN_HPG Equity Repor_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025-en<\/a><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><span style=\"font-family: helvetica, arial, sans-serif\"><strong>MAIN CONTENT<\/strong><\/span><\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">According to the latest update, Blast Furnace No. 2 of the Dung Quat 2 Project produced its first batch of hot metal on September 4, marking an important milestone for the Group\u2019s entire project. Once fully operational, Dung Quat 2 is expected to add 5.6 million tons of HRC to HPG\u2019s capacity. Specifically, Blast Furnace No. 1 of the project has been in commercial operation since the end of March 2025, raising HPG\u2019s cumulative output in the first six months to 5.1 million tons. Blast Furnace No. 1 of DQ2 is expected to operate at 50% capacity in 2025 and increase to 70%\u201380% capacity in 2026. Meanwhile, Blast Furnace No. 2 of DQ2 is scheduled to commence commercial operation by late 2025 to early 2026.<\/span><\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">With this update, HPG\u2019s total crude steel output is expected to reach about 10.4 million tons in 2025, up 20% YoY.<\/span><\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">On July 29, HPG received approval for the revised investment plan of the Dung Quat 2 project. Under the latest adjustment, Dung Quat 2 will raise its annual capacity to 6.1 million tons of products, including 5.6 million tons of hot-rolled coil (HRC) steel (unchanged, with two blast furnaces expected to be operational in 2026) and 500,000 tons of high-quality wire rod (scheduled to commence operation in 2028).<\/span><\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">On August 1, Blast Furnace No. 1 of DQ1 resumed operation after more than a month of scheduled maintenance, helping ensure HPG\u2019s smooth production activities.<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\"><strong>VALUATION AND RECOMMENDATION<\/strong><\/span><\/p>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">HPG is receiving positive momentum from: (i) growth drivers from the Dung Quat 2 project, with production output expected to grow by 20% per year; (ii) steel prices expected to bottom out amid China\u2019s supply cuts (government regulation) and strong domestic steel demand supported by the public investment disbursement cycle.<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-family: helvetica, arial, sans-serif\">We value HPG at VND 33,700 per share and recommend <strong>\u201cAccumulate\u201d<\/strong>, with an expected return of 12.9% compared to the closing price on September 4, 2025. <\/span><\/p>\n","protected":false},"author":31,"featured_media":0,"template":"","cate_research":[80],"specialized":[],"class_list":["post-33069","research","type-research","status-publish","hentry","cate_research-bao-cao-doanh-nghiep-en"],"yoast_head":"<title>GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA\" \/>\n<meta property=\"og:description\" content=\"GTJASVN_HPG Equity Repor_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025-en MAIN CONTENT According to the latest update, Blast Furnace No. 2 of the Dung Quat 2 Project produced its first batch of hot metal on September 4, marking an important milestone for the Group\u2019s entire project. Once fully operational, Dung Quat 2 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"GTJA\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-15T06:47:14+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/gtjai.com.vn\/#website\",\"url\":\"https:\/\/gtjai.com.vn\/\",\"name\":\"GTJA\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/gtjai.com.vn\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#webpage\",\"url\":\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/\",\"name\":\"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA\",\"isPartOf\":{\"@id\":\"https:\/\/gtjai.com.vn\/#website\"},\"datePublished\":\"2025-09-05T06:43:37+00:00\",\"dateModified\":\"2025-09-15T06:47:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/gtjai.com.vn\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025\"}]}]}<\/script>","yoast_head_json":{"title":"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/","og_locale":"en_US","og_type":"article","og_title":"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA","og_description":"GTJASVN_HPG Equity Repor_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025-en MAIN CONTENT According to the latest update, Blast Furnace No. 2 of the Dung Quat 2 Project produced its first batch of hot metal on September 4, marking an important milestone for the Group\u2019s entire project. Once fully operational, Dung Quat 2 [&hellip;]","og_url":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/","og_site_name":"GTJA","article_modified_time":"2025-09-15T06:47:14+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/gtjai.com.vn\/#website","url":"https:\/\/gtjai.com.vn\/","name":"GTJA","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/gtjai.com.vn\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#webpage","url":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/","name":"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025 - GTJA","isPartOf":{"@id":"https:\/\/gtjai.com.vn\/#website"},"datePublished":"2025-09-05T06:43:37+00:00","dateModified":"2025-09-15T06:47:14+00:00","breadcrumb":{"@id":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/gtjai.com.vn\/en\/research\/gtjasvn_hpg-equity-repor_2nd-phase-of-dung-quat-2-ready-for-operation_sep-04-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/gtjai.com.vn\/en\/"},{"@type":"ListItem","position":2,"name":"GTJASVN_HPG Equity Report_2ND PHASE OF DUNG QUAT 2 READY FOR OPERATION_Sep 04 2025"}]}]}},"_links":{"self":[{"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/research\/33069\/"}],"collection":[{"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/research\/"}],"about":[{"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/types\/research\/"}],"author":[{"embeddable":true,"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/users\/31\/"}],"wp:attachment":[{"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/media\/?parent=33069"}],"wp:term":[{"taxonomy":"cate_research","embeddable":true,"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/cate_research\/?post=33069"},{"taxonomy":"specialized","embeddable":true,"href":"https:\/\/gtjai.com.vn\/en\/wp-json\/wp\/v2\/specialized\/?post=33069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}